How many cavities should a new container have
Cavity count is an output decision wearing a tooling costume. Do the arithmetic first, then test the answer against the platen, the mold and the changeover time you can live with.
Start from output, not from cavity count
The machine does not have cavities. It has heads, a clamp and a platen. The mold has cavities. Together they produce a number of bottles per hour, and that is what you are buying.
Write the target down before anything else: bottles per month, hours per day, and the efficiency you actually run at. Most factories plan at 80–85% of theoretical output once changeovers, stoppages and rejects are counted.
A 400,000 bottle month over 22 days of 20 hours is 909 bottles per hour. That single division decides the machine, the head count and the mold.
Cavity count is usually argued as a preference, four or six, when it is really the answer to a sum. Get the sum right and the preference disappears.
The arithmetic
Bottles per hour = 3600 ÷ cycle time × cavities per station × stations.
A 9 s cycle with four cavities on a single station: 3600 ÷ 9 × 4 = 1,600 bottles per hour. The same mold on a double-station machine doubles that, provided you have a second mold or a two-station mold.
Invert it and the same job can be done two ways. 909 bottles per hour is four cavities at 16 s, or two cavities at 8 s. Both meet the target. They are different machines with different tooling and different flexibility, and only one of them is comfortable for your changeover pattern.
The cycle time is the figure to interrogate. Ask at what bottle weight it was measured, and whether it was a trial or a running average with a full shift behind it.
What the platen and the mold will allow
The figures below hold the cycle at 9 s so the comparison stays honest. The constraint column is the part that decides the answer.
| Cavities | Output at 9 s cycle | Constraint that appears | Typical container |
|---|---|---|---|
| 1 | 400 per hour | Any platen; smallest mold, least tooling | 5–25 L, thicker wall |
| 2 | 800 per hour | Standard platen, two heads spaced evenly | 3–10 L |
| 3 | 1,200 per hour | Three heads, even spacing, longer purging | 1–5 L |
| 4 | 1,600 per hour | Four heads at 100–120 mm centers | 500 ml–3 L |
| 6 | 2,400 per hour | Wide platen; mold weight needs a hoist | 200 ml–1 L |
| 8 | 3,200 per hour | Clamp force and cooling become the limit | Under 500 ml |
Why one more cavity is not always cheaper per bottle
- Mold cost rises faster than cavity count. A six-cavity mold is closer to twice a four-cavity than 1.5 times, because of alignment, cooling and flow balancing.
- Cycle time rises with cavities: more plastic per cycle, longer cooling, a heavier parison to control.
- Scrap is paid per cavity. A six-cavity mold discards six bottles at every adjustment, and a new container needs a great many adjustments.
- A double-station machine needs two molds or a two-station mold, which changes the tooling budget rather than the machine budget.
- Blocking a cavity is normal practice, but a blocked cavity still costs cooling, maintenance and floor space.
The saving at the margin is real but small. If a fifth cavity lifts output by 20% while adding a heavier cycle and a wider mold, the extra bottles can cost more per bottle than an extra shift on four cavities.
The rule worth keeping: choose the smallest cavity count that meets output at a cycle you can hold, then keep one cavity in reserve for growth.
Where to go next
- Blow molding output calculation — the same formula with worked examples.
- Single versus double station — the other way to double output without more cavities.
- Blow molds — what cavity count does to mold construction.
- Small bottle machines — where six and eight cavity molds usually belong.
Need a machine sized for your container?
Send the container size, weight, material and the output you need. We answer with a machine proposal and a capacity calculation, not a catalogue.