What to check on a factory visit before you order

A machine works is judged in the assembly bay and the test bay, not in the meeting room. Walk the floor in this order, score what you see, and ask who will be standing beside the machine when it runs your first bottle.

Visit the works, not the showroom

You are checking three things: whether the machines are built to a drawing or to a habit, whether the works can test what it sells, and whether the people answering your emails are the people who will commission the machine.

Walk the floor before the presentation. A works that is tidy at the assembly bay and chaotic at the machining bay usually buys its critical parts outside and assembles them, which is a different business from the one being described to you.

Take photographs, ask for the drawing number of the frame you are looking at, and note how long a machine has stood in the same place. A half-built machine that has not moved since your last visit is information.

Twelve points, in the order that tells you most

# What to check A good answer looks like What to worry about
1 Assembly bay Machines on a marked floor grid, tools at each station, torque marks on clamp bolts Machines assembled wherever there is room
2 Machining Platens and mold plates machined in-house and measured afterwards Plates bought in and painted over
3 Frames and welding Jigs used, welds dressed, frame square checked with an instrument Frames squared by eye
4 Wiring Loomed, numbered, ferrules crimped, earth to every panel Loose wires, tape, no numbers
5 Hydraulics Straight pipe runs, no leaks under pressure, filters dated Oil on the floor, unmarked hoses
6 Pneumatics Labelled manifold, dryer on the line, gauge per circuit Air taken from a wall tap
7 Control panel Named components, spare terminals, wiring diagram in the door Unlabelled relays, photocopied diagram
8 Test bay Every machine run before dispatch, with a written record Only the buyer’s machine is run
9 Test with your mold Your container blown, weighed and leak tested A sample bottle from a different mold
10 Parts stock Consumables on the shelf with part numbers We will send it when you need it
11 Metrology Callipers, wall gauge and hardness tester in daily use No measuring tools on the floor
12 Commissioning team Names, and the same people who built the machine A separate service company

Bring your mold, or send your container

A test run on a house mold proves the machine runs. A test run on your mold proves it runs your container, which is the only claim you can take to a bank.

At the trial ask for three things: the weight of five consecutive bottles, the cycle time shown on the controller, and a leak test at the pressure you use in your own plant. A weight spread above plus or minus 2% on a 30 g bottle means the wall control is not set yet, not that the machine is bad.

If your mold is not ready, send a sample container and ask for it to be blown on the machine being offered. Watch how long the set-up takes. That number is the changeover time you will live with for the next ten years.

Ask who signs the commissioning report

If the answer is a third party, the warranty conversation after start-up will have three participants and no owner. Ask for the report template before you order, not after the machine lands.

  • How many days of commissioning are included, and what happens if acceptance is not reached in that time.
  • Who supplies material, power, water and compressed air during the trial.
  • What the acceptance criteria are: output, weight tolerance, leak rate, scrap rate.
  • Who trains the operators, for how long, and in which language.
  • What parts ship with the machine, item by item, with part numbers.

Where to go next

Need a machine sized for your container?

Send the container size, weight, material and the output you need. We answer with a machine proposal and a capacity calculation, not a catalogue.

Send your container