How to calculate blow molding output: three formulas and a worked example

Output is a multiplication, not a specification. Three formulas give you containers per hour, containers per month, and a check that the extruder can feed the mold you have chosen.

Formula one: containers per hour

Hourly output = 3,600 ÷ cycle time in seconds × containers per cycle.

Containers per cycle is the die head count multiplied by the number of stations: a double-station machine with three die heads produces six containers per cycle.

Configuration Per cycle Cycle Output per hour
2 heads, double station 4 15 s 960
3 heads, double station 6 28 s 771
4 heads, single station 4 16 s 900
1 head, double station, 5 L 2 32 s 225

Formula two: containers per month and per year

Monthly output = hourly output × hours per day × 30. Annual output = hourly output × hours per day × 300.

The hours-per-day figure is where most business plans go wrong. A machine running three shifts is not running 24 productive hours: take out breaks, start-ups, color changes, mold changes and breakdowns. Use 20 hours for a well-run three-shift plant, 16 for two shifts.

Hourly output Hours per day Per month (30 d) Per year (300 d)
960 20 576,000 5,760,000
771 20 462,600 4,626,000
225 20 135,000 1,350,000

Formula three: can the extruder feed it?

Kilograms per hour = containers per hour × container weight in grams ÷ 1,000 × 1.4.

The 1.4 is the allowance for flash, start-up lumps and rejects. If the result is above the screw’s plasticising capacity, the machine will starve: the parison gets thin, the cycle stretches and the weight wanders.

Container Weight Containers/hour kg/h with allowance
1 L bottle 28 g 900 35
3 L jerry can 95 g 450 60
5 L container 130 g 225 41
20 L drum 850 g 60 71

Compare each figure with the screw table for the model you are considering. If the margin is under about 20%, move up one screw size rather than accept a machine that runs at its limit all day.

A worked example

Target: 600,000 one-liter bottles a month, two shifts, 20 hours a day, 30 days.

  1. Required hourly output: 600,000 ÷ 30 ÷ 20 = 1,000 per hour.
  2. At a 16-second cycle: containers per cycle = 1,000 × 16 ÷ 3,600 = 4.4. Round up to 6 — a three-head double-station machine.
  3. Actual output at 16 s and 6 per cycle: 1,350 per hour. That is well above target, which means the cycle can be relaxed to protect wall thickness, or the mold can be run at four cavities instead of six.
  4. Material check: 1,350 × 28 g × 1.4 ÷ 1,000 = 53 kg/h. A 55 mm screw at about 48 kg/h would be marginal; a 65 mm screw at about 60 kg/h is comfortable.

The lesson: the cavity count and the screw are two separate decisions, and the second one is usually the one that gets missed.

Why quoted output is always higher than real output

Quoted figures assume 100% efficiency. Real plants run 80–90% once you account for start-up scrap, color changes, mold changes, maintenance and operator breaks. Plan on 85% and treat anything above that as a bonus, not a budget.