Twenty questions buyers ask before ordering a blow molding machine
Short, direct answers to the questions that come up in almost every first conversation, from container range and materials to utilities and training.
Container and machine
1. What container sizes can one machine make? A platform is rated by its maximum volume, but it can run anything below that. The limit on small containers is cavities and cycle time, not the machine.
2. Can I run several container sizes on one machine? Yes, with a mold for each. Changeover takes hours, so the number of sizes you run per week decides whether one machine makes sense.
3. How many cavities should I choose? As many as the target output requires at a realistic cycle, subject to the mold fitting the platen and the die head center distance.
4. Single or double station? Double for long runs of one container; single for frequent mold changes and large containers.
5. How much floor space does a machine need? Plan for the machine, the mold handling area, the granulator, the chiller and at least one metre around the clamp for access.
Material
6. Which plastics can the machine process? HDPE, LDPE, PP, PETG and PVC with the correct screw and die head; multilayer structures need multiple extruders.
7. Do I need a different screw for different materials? For HDPE and PP a general-purpose screw is usually fine. PETG and PVC need dedicated screws.
8. Can I use regrind? Yes, up to about 30% on a single-layer machine. On a multilayer machine the regrind goes in the middle layer and can run higher.
9. Is the mold the same for HDPE and PP? No. Shrinkage differs, and PP shrinks directionally, so the container will be out of tolerance.
Output and cost
10. How is output calculated? 3,600 divided by cycle time, multiplied by containers per cycle (die heads × stations).
11. Why is real output lower than quoted? Quoted figures assume 100% efficiency. Plan on 80–90%.
12. What sets the cycle time? Container wall weight and cooling, not the machine’s speed. Thicker walls need longer cooling.
13. How do I compare two quotations? Line by line, on the same configuration. A lower price usually means fewer cavities, no de-flashing, no wall thickness control or a smaller screw.
Installation and utilities
14. What utilities do I need? Three-phase power at the specified voltage and frequency, cooling water to the chiller, and 0.6–0.8 MPa compressed air.
15. What floor do I need? Level, load-bearing concrete, with room to move molds and to access both sides of the clamp.
16. Who installs the machine? Our engineer supervises alignment, runs the first molds and trains your operators. You prepare the floor and the utilities, and cover the engineer’s travel and local costs.
17. How long does installation take? One machine with one or two molds is a few days; a multi-machine line takes longer, mostly because each mold has to be run and adjusted.
18. What training is included? Start-up and shutdown, temperature and wall thickness settings, mold change, and the daily checks.
19. What spare parts should I hold? Heater bands, thermocouples, blow pins, de-flashing blades and seals — the items that stop the line when they fail.
20. What do you need from me to quote? Container volume, weight, dimensions, neck finish, material, layer structure, target output and the utilities available. With those, a proposal is a calculation, not a guess.
Where to go next
- KSY model range — container range and screw sizes
- Applications — containers by industry
- Five decisions — the long version of question three
- Engineering references — how these answers look on a real line configuration
Need a machine sized for your container?
Send the container size, weight, material and the output you need. We answer with a machine proposal and a capacity calculation, not a catalogue.